image
ATLANTIS RESORT - DUBAI, UAE

Spray applied passive fire protection to building HVAC air handling ductwork system.

 

Architect: ARCHAVISION INTERNATIONAL OLIO, WILSON ASSOCIATES & WIMBERLY, ALISON, TONG AND GOO

Head Contractor: AL NABOODAH LAING O'ROURKE

MEP Contractor: BK GULF ROTARY

Applicator: Intherpro LLC

image
INDEX TOWER - Dubai international Financial Centre, UAE

Passive fire protection to MEP services including vertical duct risers and horizontal HVAC and other serivces.

 

Consultant: HYDER CONSULTING ME

MEP Contractor: BK GULF LLC

Applicator: Intherpro LLC

image
PARK PLACE TOWER - DUBAI, UAE

Spray applied passive fire protection to building HVAC air handling ductwork system.

 

Consultant: COX ARCHITECTURE

MEP Contractor: DRAKE & SCULL

Applicator: Intherpro LLC

image
JAL TWIN TOWERS - DUBAI, UAE

Passive fire protection to MEP services including riser shafts and plantrooms.

 

Consultant: DIMENSIONS ENGINEERING CONSULTANT LLC 

MEP Contractor: HASTIE INTERNATIONAL

Applicator: Intherpro LLC

image
THE RITZ CARLTON - DUBAI, UAE

Spray applied passive fire protection to building HVAC air handling ductwork system.

 

Consultant: WSP Middle East

MEP Contractor: ETDE-VERGER JV

Applicator: Intherpro LLC

image
CROWNE PLAZA - ABU DHABI, UAE

Installation of passive fire protection to MEP services including vertical duct risers and other horizontal HVAC and MEP services.

 

Consultant: RESIDENT ENGINEERS

MEP Contractor: BK GULF LLC

Applicator: Intherpro LLC

image
STAYBRIDGE SUITES - ABU DHABI, UAE

Installation of fire protection to MEP services including smoke extract ducts.

 

Consultant: RESIDENT ENGINEERS

MEP Contractor: BK GULF LLC

Applicator: Intherpro LLC

image
CUSTOMS HOUSE- AUSTRALIA

Passive fire protection upgrade to existing heritage ceilings, smoke sealing to electrical risers and fire stairs compartmentalization. 

 

Head Contractor: GROUP ONE 

Architect: TONKIN ZULAIKHA GREER Pty Ltd

image
LATITUDE EAST, AUSTRALIA

Passive fire protection upgrade to two off fire stair walls from Level 10 to Level 51 using LAF’s Trimesh® curtain wall system.

 

Architect: CRONE PARTNERS

Head Contractor: MULTIPLEX CONSTRUCTIONS Pty Ltd

Applicator: Ceilspray Pty Ltd

image
NSW PARLIAMENT HOUSE, AUSTRALIA

Horizontal prefabricated Vermitex® TH panel bulkhead protecting data cables and essential services from ceiling incipient fires.

 

Head Contractor: BAULDERSTONE HORNIBROOK Pty Ltd

Architect: GOVERNMENT ARCHITECT

Applicator: L & A Fazzini Pty Ltd

image
BITEC EXHIBITION HALL, THAILAND

LAF supplied Vermitex® AF to Repax (Thailand) for installation to structural steel elements to achieve a two hour fire protection.

 

Client: BANGKOK INTERNATIONAL TRADE AND EXHIBITION CENTRE

Head Contractor: THAI OBAYASHI CORP. Ltd

Applicator: Repax

image
SYDNEY 2000 OLYMPICS - ACER ARENA, AUSTRALIA

Passive fire protection to structural steel, MEP services (Supply & return air and supply & kitchen exhaust). Design and construct of air plenums and pre-cast fire protection to permanently exposed roof backstay cables.

 

Head Contractor: ABIGROUP CONTRACTORS 

Architect: COX ARCHITECTS Pty Ltd

MEP Contractor: TRIPLE ‘M’ GROUP 

Applicator: L & A Fazzini Pty Ltd

image
M5 EAST FILTRATION PROJECT - SYDNEY, AUSTRALIA

Services penetrations, steel and concrete elements were sprayed with LAF’s cementicious fire protective coating.

 

Client: RTA / INTERLINK ROADS

Prime Contractor: BAULDERSTONE HORNIBROOK Pty Ltd

Applicator: L & A Fazzini Pty Ltd

image
ROYAL RANDWICK RACECOURSE - SPECTATOR PRECINCT, AUSTRALIA

Fire Protection to the structural steel beams and columns for an FRL of 1, 2 and 3 hours. Due to time constraints, day/night shift were utilised in conjunction with the steel roof trusses sprayed with Vermitex® AF prior to the roof sheeting being installed. LAF's Ferma-rain mixture was used to assist with water prevention.

 

Client: AUSTRALIAN TURF CLUB

Architect: ARUP

Head Contractor: BROOKFIELD MULTIPLEX

Applicator: L&A Fazzini Pty Ltd

image
NORTH SHORE PRIVATE HOSPITAL - NORTH WING, AUSTRALIA

Fire Protection to slab extension steel beams for a 2 hour FRL.  Vermitex® AF was sprayed and trowelled smooth for a painted finish with LAF's Vapotex®.

 

Client: RAMSAY HEALTH CARE

Architects: HEALTH PROJECTS INTERNATIONAL Pty Ltd

Head Contractor: LEND LEASE 

Applicator: L&A Fazzini Pty Ltd

image
JURONG ROCK CAVERN, SINGAPORE

Fire protection of structural steel for up to 4 hrs according to HC curve.

 

Client: JTC CORPORATION

Main Contractor: HYUNDAI ENGINEERING & CONSTRUCTION Co. Ltd

Consultant: GK-JCPL CONSORTIUM

Project Manager: SINTEF-TRITECH-MULTICONSULT CONSORTIUM

image
HAYES STREET APARTMENTS, NEUTRAL BAY, AUSTRALIA

Fire protection for 1 hour separation between the occupied floors.  LAF adopted the Foamed Vermitex® Heritage system where the fire protection was achieved without interfering with the decorative heritage ceilings.

 

Head Contractor: PROFILE PROPERTY GROUP

Applicator: L&A Fazzini Pty Ltd

image
NORTH GATE MALL, QATAR

Fire Protection for 2 hours to Air Handling System.

 

Main Contractor: HABTOOR LEIGHTON GROUP

Consultant: GHD

Mechanical Contractor: VOLTAS Ltd

Applicator: Jascon Engineering

image
ALMEERA MALL, QATAR

Fire Protection for 2 hours to Air Handling System.

 

Main Contractor: KG GROUP

Consultant: UNITED CONSULTANT

Mechanical Contractor: HBK ENGINEERING

Applicator: Jascon Engineering

image
AL-KHALEEJ TOWER, QATAR

Fire Protection for 2 hours to Air Handling System.

 

Main Contractor: KG GROUP

Consultant: UNITED CONSULTANT

Mechanical Contractor: HBK ENGINEERING

Applicator: Jascon Engineering