image
AL-RAYYAN TOWER, QATAR

Fire Protection for 2 hours to Air Handling System.

 

Main Contractor: QATARI DEVELOPMENT

Consultant: SKETCH DESIGN & CONSULTANT

Mechanical Contractor: HBK ENGINEERING

Applicator: Jascon Engineering

image
MUSEUM OF CONTEMPORARY ART REDEVELOPMENT (MCA), AUSTRALIA

Fire Protection to structural steel beams and columns of the new George St gallery additions for a 2 hour FRL.

 

Client: MUSEUM OF CONTEMPORARY ART

Head Contractor: WATPAC CONSTRUCTIONS

Applicator: L&A Fazzini Pty Ltd

image
THE UNIVERSITY OF TECHNOLOGY - ANATOMY LABORATORIES, AUSTRALIA

Fire protection to structural steel beams and columns for a 2 hour FRL of the new storage cool room and surgery skills laboratory.

 

Client: UNIVERSITY OF TECHNOLOGY

Head Contractor: PATTERSON BUILDING GROUP

Architect: DESIGN Inc

Applicator: L&A Fazzini Pty Ltd

image
AMCOR B9 PAPER MILL, AUSTRALIA

Fire protection to the structural columns and beams for a 2 hr FRL of the new office building.

 

Client: AMCOR

Head Contractor: LEIGHTON CONTRACTORS

Construction Fit Out: HANEM GROUP

Applicator: L&A Fazzini Pty Ltd

image
RAVENSWORTH COAL PLANT, AUSTRALIA

Fire Protection for 1 hour FRL to structural beams, columns and bondek within each transformer room.

 

Client: XSTRATA COAL

Head Contractor: DOWNER EDI ENGINEERING

Applicator: L&A Fazzini Pty Ltd

image
ANYTIME FITNESS CLUB, AUSTRALIA

Fire Protection to structural beams and columns for 2 hour FRL in basement carpark complete with Vapotex® water protection.

 

Client: ANYTIME FITNESS

Applicator: L&A Fazzini Pty Ltd

image
PROSERPINE SUGAR MILL, AUSTRALIA

Fire Protection for 2 hour FRL to steel columns supporting storage silos in tropical environment.

 

Client: PROSERPINE SUGAR MILLING ASSOCIATION

Head Contractor: WDT ENGINEERS Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
CHRIS O'BRIEN LIFEHOUSE, AUSTRALIA

Construction of a Trimesh® Riser dividing wall and sprayed with Vermitex® TH. The composite Vermitex® TH/Trimesh® saved substantial wall thickness in dividing two separate fire zones of the mechanical systems.

 

Client: LIFEHOUSE AT RPA

Head Contractor: BROOKFIELD MULTIPLEX

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
MICA CREEK POWER STATION, AUSTRALIA

Fire Protection to structural steelwork supporting pre-cast fire wall for a 2 hour FRL.

 

Client: CS ENERGY

Head Contractor: FK GARDNER & SONS

Applicator: L&A Fazzini Pty Ltd

image
ROYAL NORTH SHORE HOSPITAL - ACUTE BUILDING, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL : Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems. Several mechanical systems required 2 hour FRL in conjunction with a thermal R-Value of 1.5.

 

Client: INFRASHORE

Head Contractor: THIESS Pty Ltd

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
THE KINGHORN CANCER CENTRE, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL : Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems.

 

Client: ST VINCENT'S HOSPITAL & GARVAN INSTITUTE

Head Contractor: RICHARD CROOKES CONSTRUCTIONS Pty Ltd

MEP Contractor: ALLSTAFF AIR CONDITIONING Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
CHRIS O'BRIEN LIFEHOUSE, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL : Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems complete with Trimesh® Fan Enclosures. Trimesh® fan enclosures were build with over-size Igniseal® access panels for easy replacement of fan units. Self supporting PVC ductwork for exhaust and fume cupboard systems.

 

Client: LIFEHOUSE AT RPA

Head Contractor: BROOKFIELD MULTIPLEX

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
161 CASTLEREAGH ST, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL from basement level to level 45: Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems complete with Trimesh® Fan Enclosures. Trimesh® fire wall was also constructed around fire damper to seal blockwork fire wall.

 

Client: GROCON & ANZ

Head Contractor: GROCON

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
WESTFIELDS SYDNEY CITY, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL: Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems complete with Trimesh® Fan Enclosures. 

 

Client: WESTFIELD'S

Head Contractor: WESTFIELD'S CONSTRUCTION

MEP Contractor: ALLSTAFF AIR CONDITIONING Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
AUSTRALIAN TECHNOLOGY PARK - 8 CENTRAL AVENUE, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL: Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems complete with Trimesh® Fan Enclosures. Ductwork and fan enclosures within plantroom were structurally supported from the concrete slab refraining from placing additional strain to the metal deck roof.

 

Client: ATP PARTNERSHIP

Head Contractor: WATPAC CONSTRUCTION Pty Ltd

MEP Contractor: AUSTRAL AIR CONDITIONING Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
QUEENS SQUARE LAW COURTS, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL: Smoke Exhaust and Supply air systems. Majority of the works carried out during night shift so as not to interfere with the daily operations of the law courts.

 

Client: LAW COURTS

Head Contractor: REED GROUP Pty Ltd

MEP Contractor: TRIPLE 'M' GROUP

Applicator: L&A Fazzini Pty Ltd

image
STAR CITY HOTEL, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL: Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems complete with Trimesh® Fan Enclosures. Ductwork and fan enclosures within plantroom were structurally supported from the concrete slab refraining from placing additional strain to the metal deck roof.

 

Client: STAR CITY CASINO

Head Contractor: BROOKFIELD MULTIPLEX Ltd

MEP Contractor: HASTIE AUSTRALIA Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
ASCHAM SCHOOL, AUSTRALIA

Fire protection for 1 hour separation between the occupied floors. LAF adopted the Foamed Vermitex® Heritage system where the fire protection was achieved without interfering with the decorative heritage ceilings.

 

Head Contractor: D&K BUILDING SERVICES

Applicator: L&A Fazzini Pty Ltd

image
MEDICA CENTRE HURSTVILLE, AUSTRALIA

Construction of Smoke Exhaust Plenum using Trimesh® and Sprayed with Vermiduct® for a 2 hour FRL. The use of Trimesh® negated the need for sheetmetal ductwork fast tracking construction and enabling further cost savings. Vermiduct® spray was completed with a smooth trowelled finish to be painted using Vapotex®.

 

Client: CORTEZ ENTERPRISES Pty Ltd

Head Contractor: HANSEN YUNCKEN Pty Ltd

MEP Contractor: HASTIE AUSTRALIA Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
DEE WHY GRAND SHOPPING CENTRE, AUSTRALIA

Trimesh® Bulkhead constructed with fire stairs due to space constraints. Igniseal® access panels installed within Trimesh® for maintenance access of the Fan unit.

 

Head Contractor: SOUTHERN CROSS CONSTRUCTIONS Pty Ltd

MEP Contractor: CLIMATECH Pty Ltd

Applicator: L&A Fazzini Pty Ltd