Healthcare

image
EXECUTIVE TOWER DUBAI HEALTH CITY PRECINCT, UAE

Cementicious based exterior fire protective coating over inadequate fire paint coating to vertical and horizontal SHS beams and columns in fully exposed environment. FRL 2 hours.

 

Head Contractor: IRONWORLD Design LAF Group

Applicator: Intherpro LLC

image
WESTMEAD CHILDREN’S HOSPITAL, AUSTRALIA

Research and development of new self-supporting passive fire protection system for PVC ductwork used with fume cabinets smoke exhaust system.

 

Head Contractor: CONCRETE CONSTRUCTIONS Pty Ltd

Mechanical Contractor: HADEN SMITH JOINT VENTURE

Applicator: L & A Fazzini Pty Ltd

image
LIVERPOOL HOSPITAL (Stages 1, 2 & 3), AUSTRALIA

Passive fire protection to mechanical services: supply air, return air, kitchen and smoke exhaust systems.

 

Prime Contractor: BARCLAY MOWLEM CONSTRUCTION LIMITED

MEP Contractor: ENVIRON MECHANICAL CONTRACTORS

                                BERATA AIR CONDITIONING

Applicator: L & A Fazzini Pty Ltd

image
NORTH SHORE PRIVATE HOSPITAL - NORTH WING, AUSTRALIA

Fire Protection to slab extension steel beams for a 2 hour FRL.  Vermitex® AF was sprayed and trowelled smooth for a painted finish with LAF's Vapotex®.

 

Client: RAMSAY HEALTH CARE

Architects: HEALTH PROJECTS INTERNATIONAL Pty Ltd

Head Contractor: LEND LEASE 

Applicator: L&A Fazzini Pty Ltd

image
CHRIS O'BRIEN LIFEHOUSE, AUSTRALIA

Construction of a Trimesh® Riser dividing wall and sprayed with Vermitex® TH. The composite Vermitex® TH/Trimesh® saved substantial wall thickness in dividing two separate fire zones of the mechanical systems.

 

Client: LIFEHOUSE AT RPA

Head Contractor: BROOKFIELD MULTIPLEX

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
ROYAL NORTH SHORE HOSPITAL - ACUTE BUILDING, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL : Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems. Several mechanical systems required 2 hour FRL in conjunction with a thermal R-Value of 1.5.

 

Client: INFRASHORE

Head Contractor: THIESS Pty Ltd

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
THE KINGHORN CANCER CENTRE, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL : Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems.

 

Client: ST VINCENT'S HOSPITAL & GARVAN INSTITUTE

Head Contractor: RICHARD CROOKES CONSTRUCTIONS Pty Ltd

MEP Contractor: ALLSTAFF AIR CONDITIONING Pty Ltd

Applicator: L&A Fazzini Pty Ltd

image
CHRIS O'BRIEN LIFEHOUSE, AUSTRALIA

Fire protection to the mechanical systems for a 2 hour FRL : Stair Pressure, Smoke Exhaust, Kitchen Exhaust and Supply air systems complete with Trimesh® Fan Enclosures. Trimesh® fan enclosures were build with over-size Igniseal® access panels for easy replacement of fan units. Self supporting PVC ductwork for exhaust and fume cupboard systems.

 

Client: LIFEHOUSE AT RPA

Head Contractor: BROOKFIELD MULTIPLEX

MEP Contractor: FREDON AIR

Applicator: L&A Fazzini Pty Ltd

image
MEDICA CENTRE HURSTVILLE, AUSTRALIA

Construction of Smoke Exhaust Plenum using Trimesh® and Sprayed with Vermiduct® for a 2 hour FRL. The use of Trimesh® negated the need for sheetmetal ductwork fast tracking construction and enabling further cost savings. Vermiduct® spray was completed with a smooth trowelled finish to be painted using Vapotex®.

 

Client: CORTEZ ENTERPRISES Pty Ltd

Head Contractor: HANSEN YUNCKEN Pty Ltd

MEP Contractor: HASTIE AUSTRALIA Pty Ltd

Applicator: L&A Fazzini Pty Ltd