Passive fire protection upgrade to existing heritage ceilings, smoke sealing to electrical risers and fire stairs compartmentalization.
Head Contractor: GROUP ONE
Architect: TONKIN ZULAIKHA GREER Pty Ltd
Fire protection for 1 hour separation between the occupied floors. LAF adopted the Foamed Vermitex® Heritage system where the fire protection was achieved without interfering with the decorative heritage ceilings.
Head Contractor: PROFILE PROPERTY GROUP
Applicator: L&A Fazzini Pty Ltd
Head Contractor: D&K BUILDING SERVICES